PROJECTS
CEMENTERA EN GUATEMALA
IACSA Guatemala suministró estructura metálica para:
Silo de Clinker 377 Toneladas
Desempolvado del enfriador de Clinker 560 Toneladas
Edificio de Molino de carbón 358 Toneladas
Edificio de Molino de crudo 1025 Toneladas
Estructuras de soporte 118 Toneladas
Bandas Transportadoras 1462 Toneladas
Misceláneos 110 Toneladas
CEMENTERA EN GUATEMALA
Construction of a new cement plant in Guatemala, 4,000 tons of metallic structure were supplied.
Silo de Clinker 377 Tons
Clinker Cooler Dust Off 560 Tons
Coal Mill Building 358 Tons
Crude Mill Building 1025 Tons
Support structures 118 Tons
Conveyor Belts 1462 Tons
Miscellaneous 110 Tons
AEROPUERTO INTERNACIONAL DE CANCÚN
IACSA participated in the construction of the main buildings of theT4 Terminal of the Cancun International Airport, with a total of 2,750 tons for the building distributed as follows:
B4 290 Tons
C4 153 Tons
D4 607 Tons
E4 120 Tons
F4 716 Tons
J4 350 Tons
K4 413 Tons
Miscellaneous 102 Tons
AUTOMOTIVE INDUSTRY
Due to the expansions and new automobile assembly plants in our country, IACSA has contributed more than 3,600 tons for the supply, manufacture, and assembly of metallic structures. These structures were for warehouses, industrial warehouses, industrial platforms, and automotive service buildings.
Puebla 2500 Tons
San Luis Potosí 1200 Tons
HELEA
We supplied 3,500 tons of metal structure for the emblematic residential building in the City of Puebla, with 142 meters high, 33 levels, and 96 apartments.
Emblematic residential building in the City of Puebla, with 142 meters high, 33 levels, and 96 apartments, with a total 3,500 tons of metal structure and assembly at a height of 142 meters, for the construction of 33 levels of the most emblematic building residential in the city of Puebla.
OIL INDUSTRY
Our participation in the oil industry has been noted for the construction of new hydrocarbon pumping and storage stations in our country, this has allowed us to meet and surpass the quality standards with our products.
Tula and Salamanca refineries 220 Tons
Veracruz Oil Terminal 120 Tons
Valle de México Oil Terminal 590 Tons
Puebla Oil Terminal 530 Tons